Partum provided the engineering and design for the Kanyirri 220/66/22kV Substation as part of the Pilbara Transmission Project.
The development of Kanyirri 220/66/22kV Substation Consisted of:
- 1 x 80MVA 220/66/22kV Power Transformer with oil bund and oily water separator system
- 1 x 220kV Hybrid Circuit Breaker
- 1 x 66kV Hybrid Circuit Breaker
- 220kV Surge Arresters, 220kV CVTs, 220kV SPI etc primary equipments
- Earthing, Lightning, Lighting and CCTV System
- AC auxiliary supplies including Emergency Generator
- 22kV RMU
- 220kV Control room foundation and yard equipment interfacing design
Civil/Structural:
- Detailed construction drawings for earthworks and roadworks
- Site external and internal drainage design
- Transformer bund foundation design
- 220kV & 66kV equipment Foundation, support structures
- 220kV Controlroom foundation design
- Site trenching and conduit design
- Site perimeter Fencing layout and detail design
- Future extension bay foundations design
- Civil/Structural design calculations and report
Electrical:
- Site General arrangement with future extension suitability
- Site Elevations and clearance design
- Detailed primary equipment electrical assembly with material selection and take offs.
- Substation earthgrid, lighting and security CCTV layout
- Detailed primary equipment earthing assemblies
- Electrical calculations and design support documentation
- Outdoor lighting, lightning, and earthing studies
- Short circuit force calculations
- Signage and labelling
- Material take-offs