Project Scope
Project Scope
As part of the new Rio Tinto Koodaideri iron ore mine, Partum was engaged to undertake the design of the 33kV overhead
powerlines that started and ended at the 220kV/33kV bulk supply substation, forming a ring network configuration and
providing power supply to various critical Rio Tinto mine facilities.
The powerline included the connection of:
The powerline comprised of over 50km of phosphorus and cherry conductor along with a 60 core single mode fibre OPGW
throughout the mine.