At Partum Engineering we deliver exceptional electrical engineering solutions with a commitment to quality and sustainability, ensuring reliable and future-ready projects.
Filter By
Civil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical
HMAS Stirling Garden Island
The HMAS Stirling electrical infrastructure was being upgraded to provide dual redundancy within their network, in particular to the Central…
READ ARTICLELines and Cables, Power and Earthing System Studies
Pilbara Transmission Project (PTP) Stage 3 220kV Transmission Line
Delivering a resilient 98km 220kV transmission line for Fortescue’s Pilbara Transmission Project, ensuring reliability from North Star Junction to Kanyirri.
READ ARTICLECivil and Structural, , Primary and Secondary Electrical, Protection SCADA and Communications
Western Renewables Link Early Contractor Involvement (ECI)
Concept design of a Digital Substation (IEC61850 standards) 500kV Terminal Station to support connection of the Western Renewable Zone to…
READ ARTICLELines and Cables, Power and Earthing System Studies
Rio Tinto Western Turner Syncline 33kV Line Design
Powering Progress: Delivering Reliable 33kV Solutions for Rio Tinto’s Western Turner Syncline Expansion
READ ARTICLECivil and Structural, Power and Earthing System Studies, Preliminary Site Investigations, Primary and Secondary Electrical, Protection SCADA and Communications
Synergy 100MW/200MWh Battery Energy Storage System (BESS)
Design and Engineering of Advanced High-Capacity Substation and Battery Energy Storage System
READ ARTICLELines and Cables, Power and Earthing System Studies
, BHP OB24 to OB25 Haul Road Crossing
Ensuring safe and reliable haul road construction with expert powerline clearance solutions
READ ARTICLEPower and Earthing System Studies
Pannawonica Powerline EPR/LFI Hazard Assessment Report
Ensuring Safety at Pannawonica: Mitigating Electrical Hazards with Advanced EPR and LFI Analysis
READ ARTICLECivil and Structural, Power and Earthing System Studies, Primary and Secondary Electrical, Protection SCADA and Communications
Solomon 220/132/11kV Substation
Innovative 220kV GIS substation design powering Fortescue’s Pilbara Transmission Project with reliability, efficiency, and future-ready scalability.
READ ARTICLELines and Cables, Power and Earthing System Studies
Karratha Dampier 132kV Line Upgrade
Horizon Power’s Karratha Terminal (KRT) and Dampier Substation (DMP) is connected via a 19km single 132kV circuit KRT-DMP 81.
READ ARTICLE